chiefkeef6367 chiefkeef6367
  • 04-05-2018
  • Computers and Technology
contestada

You already created a line chart, but now decide that you want to change this chart to a pie chart. to do this, you click ____ from the type group in the chart tools design tab. change chart type alter existing chart modify chart new chart

Respuesta :

Kathyscott Kathyscott
  • 17-05-2018
Click change Chart Type from the type group in the chart tool design tab.
Answer Link

Otras preguntas

Which term matches this definition? Devices that isolate or remove the bloodborne pathogens hazard from the workplace
Why does the headless horseman carry his head under his arm geometry worksheet?
How long so you have to drive at 45 mph to get to 1 mile?
The second bank of the united states became a divisive political issue because
Why do concert halls often have drapes or other soft material on the walls?
While poison is the main suspect in the case, what are other ways a person could die of hypoxia?
Which period of the cell cycle does a cell spend most of it's time in?
In an experiment the group that is not exposed to the independent variable is called the
What is the product of 96.5 x 2.54 ?
What is the solution to the following system of equations? 2x + 3y = 6 x + y = 4