briannawatson3229 briannawatson3229
  • 04-03-2024
  • Social Studies
contestada

A TIMI risk score of 0-2 indicates:
A) High Risk
B) Intermediate Risk
C) Low Risk
D) No Risk

Respuesta :

barnettsophie37 barnettsophie37
  • 04-03-2024

Answer: C) Low Risk

Explanation:

Answer Link

Otras preguntas

A project team notes that the rehabilitation of an outdated water treatment facility will require at least 100 full-time employees for the year-long constructio
A pencil is 712 inches long. How long is the pencil in centimeters?
The final velocity, v, of an object is related to its initial velocity, u, its acceleration, a, and its displacement, s by the following formula: v² = u² + 2as
Found the following number to 1 significant figures: 238.02
give an example not illustrating popular sovereignty
A cannon fires a shell at 150 m/s at an angle of 20 degrees to the horizontal. How long is the cannon ball in the air if it lands in the ground level with the m
HELP PLEASE! Select a figure from the options which will continue the same series as established by the problem figures.Please answer somebody! Need answer.
1. Pick a correct sentence. a) Youth should not be held responsible for the climate change. b) We should visit a lake that Jeremy recommended so much. c) Th
3) Data for a project come from 30 randomly selected apple trees where each tree was assigned one time to be pruned: early-, mid-, or late- season and then the
Which nuclide decays more quickly: bromine-80 or magnesium-28?