ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

what is 31/100 in simpliest form?
what type of plan is the best choice for an architect who wishes to show a client how space will be used throughout a home? A.blueprint B.contour drawing C. fl
what are some powders that you might find on the kitchen floor
Which states' delegates most strongly opposed the Virginia Plan?
What did the Populist Party initially seek? a) the gold standard b) women's right to vote c) an eight-hour work day d) regulation of railroad rates
70% of a number is 98. What is 90% of that same number? A. 63 B. 68.6 C. 88.2 D. 126
The diameter of a quarter it's about 2.4 cm what is the ratio of the radius of the quarter to the diameter of the quarter
Some unicellular organisms are similar to _______ because they have the ability to _______. A. birds, fly B. reptiles, lay eggs C. animals, move D. plants, prod
The Preamble to the United States Constitution includes the phrase "promote the general Welfare" because its authors knew that A people can be expected to act i
The Mediterranean basin countries: Spain, Portugal, Italy, Greece, Turkey, Tunisia and Morocco, produce 90% of the world's olive oil supply. What is the most