mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

Mark graphed points on the coordinate plane below to represent the locations of his school and a bank. Mark wants to add the location of the library on the coor
What fraction is missing from the following equation?
The vast majority of power under the Articles of Confederation rested with what group?
2. How does the study of fossils support the theory of evolution?
Anyone know what do I put for 4-10 because I’m kinda confused since I was only able to do 1-3
A game charges $0.99 for custom skins and a $9.99 membership fee. Write and expression that gives the total cost in dollars for c number of skins and a membersh
how the heck do you make friends on this app??
Brainliest and high points, pls help
state the processes of nitrogen,carbon and water cycle​
Which of the following is a sign a chemical reaction has occurred?