Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Which of the following technologies is the best choice to convey urgent and highly sensitive information?a. Telephone b. Fax Letter c. E-mail d. Dispatch e. Rad
The two triangles are similar. Solve for x.
You've been hired as a consultant to help an online store owner. You need to complete the implementation of conversion tracking tags into their website. What ar
which item most significantly reduces your changes of being killed or seriously injured in a motor vehicle accident?
After injecting the mice with both bacteria, what question did Griffith ask him self
Maria Womack works for a bank in Michigan and is dissatisfied with the way her manager treats her. She is planning to quit her job and find a new position with
how fast is a 2020 subaru
A cost center is a unit of a business that incurs costs without directly generating revenues. All of the following are considered cost centers except: Select on
What would be the status of an international f1 student status who got married to an American citizen and filed for status change?
In what ways have the beliefs of humanistic psychologists influenced our modern perception of personality?