Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

A person is hauling their taco stand and it takes 3,500 Joules of work to stop the taco stand. What force was exerted on the taco stand if it took 1.5 meters to
Numerous asian culture is based spring festivals on the vernal equinox this suggests that ancient cultures
Qué tiene Alejandra con ella la mayor parte del tiempo
Find the volume of a cone with a diameter of 10 yards and a height of 12 yards. round your answer to the nearest tenth.
Which of the following is an example of a standard drink
the question in the picture. Please answer fast. brainliest to who answers!
In ΔIJK, the measure of ∠K=90°, KJ = 11, IK = 60, and JI = 61. What is the value of the cosine of ∠J to the nearest hundredth?
what is 3/7 divided by 3/7 equal to and simplified
A line with a slope of -2 passes through the point (3,-1). Which of the following is the equation of the line?
Examine the impact of colonialism on congo and tanzania, as well as the impact of liberation from colonial rule.