toniaotieno
toniaotieno toniaotieno
  • 02-01-2021
  • Mathematics
contestada

how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

5am to 8 45pm is how many hours
Between the years 2009 and 2013, the primary factor that caused collisions in california was _____.
What is the value of x?
which statement best describes the association between variables X and variable Y?*moderate positive association *moderate negative association *perfect negativ
Consult an online dictionary to verify the meaning of biocontainment.It was an unmarked Level 4 biocontainment ambulance. Inside it there were an Army medical-e
Learning without direct reinforcement but by watching others is part of the behavioral approach. It is called _____.
Help me Asap Asap!!!
How many milliliters of a 1.25 molar hydrochloric acid (HCl) solution would be needed to react completely with 60.0 grams of calcium metal? (2 points) Ca (s) +
speech on the topic of "fresh air, healthy life".​
Pelvic inflammatory disease salpingitis and endometriosis can lead to _______________ pregnancy