nepalkichori12 nepalkichori12
  • 03-07-2020
  • Mathematics
contestada

5. A worker can do a piece of
piece of wook
in 14 days.
How much coook does he do ini day!
. How much work does he do in 7 days?
lijIt he works for 2 days and leaves,
how much work is left to finish it?

Respuesta :

Sueraiuka
Sueraiuka Sueraiuka
  • 03-07-2020

Answer:

therefore the left work of worker will be 6/7 part of work

Ver imagen Sueraiuka
Answer Link

Otras preguntas

What is the interquartile range for the data set??
98 POINTS !! How do the women in The Women's Bath support and sabotage each other?
x/2 + 3/2 < 5/2 give solution ​
which situation could cause an ecosystem to lose its equilibrium
A line with slope of 0 is a
List at least two things that institutions determine when awarding CLEP credits.
7) A basketball team plays 3 games in a holiday tournament. According to the tree diagram, how many outcomes are possible? A) 5 B) 6 C) 7 D) 8 8) The
Employees of ABC company uploaded files on a shared server with unique file naming conventions. However, they faced problems while locating these files. Which f
Which of the following would you be least likely to say in response to the question: ¿Fuiste a la playa ayer? a. Si, y estudié muy bien. c. Sí, y jugué en la ca
The product nuclei may or may not be _______