demons8098 demons8098
  • 02-01-2020
  • Computers and Technology
contestada

_ is an important management tool that is used to monitor and manage that contract and/or project

Respuesta :

josephsmith041496
josephsmith041496 josephsmith041496
  • 05-01-2020

Answer:

Earned Value Management (Even)

Explanation:

Even is the best management tool for monitoring the performance of a project by emphasizing the planning and integration of program cost.

Answer Link

Otras preguntas

A line has a y-intercept at (0,4) and an x-intercept at (6,0). What is the slope of the line? PLZ HELP
What is the ordered pair for 7x-2y=-5
Mr. Sanchez is reading a biography. On Day 1 he had 225 pages left to read. He plans to read 15 pages each day until he finishes the book. Write an explicit fu
While completing a practice test online, M’Lea answered 6 out of 20 questions incorrectly. If the ratio of incorrect to total questions remains constant, how ma
What is the answer to to this?
We are grateful to our workforce for the constant and unwavering support. Having seen some steep times, we now appreciate your steadfast perseverance to make th
Use the figure to find a+b+d + e. A. 330° B. 325° C. 290° D. 300° (The Answer is not B)
(X+7) (x-4) = 0 plz solve
Rain washing away soil from a hillside is an example of what Chemical Weathering A. Chemical Weathering B. Physical Weathering C. Erosion D. Deposition
7. If a waste container has 87.0 mL of 0.234 M acetic acid, how many milliliters of 2.00 M sodiumhydroxide is needed to neutralize the acid?​