Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

System of equations x-y-2z=4, -x+2y+z=1, x+y-3z=11. Solve by elimination
what is the time interval between the release of the ball and the time it reaches its maximum hieght? the acceleration gravity is 9.81m/s^2 and the maximum heig
by hw much is the difference of 604 and 406.64 less than thier sum ?
Susan invests twice as much money at 7.5% as she does at 6%. If her total interest after a year is $840 how much does she have invested at each rate?
if 120 marks is 60% what is full marks
A bank charges $3 each time you use an out of network ATM. at the beginning of the month, you have $1500 in your bank account. you withdrawal $60 from your bank
Samuel used 1/5 of an ounce of butter to make 1/15 of a pound of jelly. How many ounces of butter are needed to make a pound of jelly.
how do you say 'im getting over you' in spanish
In class 6, 80percent of the children like crisps. 75percent of the children who like crisps also like chocolate. In class 6 what percentage of the children lik
Find the value of 2 in this equation. 33- (8t) = 15